CHAPTER
7
PRODUCT CONTROLLER II ECU INSTALLATION
BEST PRACTICES AND RECOMMENDATIONS
• Do not connect battery leads until all cables are installed and connected.
• If a protected mounting location is not available on the equipment, mount the Hawkeye product controller II
ECU with the connectors facing down toward the ground to help keep moisture from accumulating in the ECU.
ELECTRICAL BOX PREPARATION
1. Locate the electrical box on top of the center rack on the back of the machine.
2. Loosen the two bolts that secure the electrical box hood in place.
3. Lift the cover off of the electrical box.
FIGURE 1. Apache Electrical Box and Controller Location
Machine
Electrical Box
4. Locate the existing product controller node.
5. Remove the three bolts that secure the existing product controller to the electrical box mounting plate.
6. Remove the existing product control node and harness from sprayer by disconnecting all connections.
7. If applicable, remove the three bolts that secure the Ultraglide node to the electrical box mounting plate.
8. Mount the Ultraglide node to the available mounting location on the right side of the electrical box mounting
plate.
9. Locate the product controller II ECU (P/N 063-0173-704) in the Hawkeye kit.
Manual No. 016-0171-587 Rev. C
I SOBUS ECU MOUNTING AND
C H A P T E R 7
CONNECTION
Product Control Node
AutoBoom Ultraglide
29