CHAPTER
4

HAWKEYE NOZZLE CONTROL VALVE INSTALLATION

BEST PRACTICES AND RECOMMENDATIONS

• Do not connect battery leads until all cables are installed and connected.
• If a dual channel turret nozzle body is installed on the implement, always mount the Hawkeye nozzle control
valve to the straight nozzle port to avoid excessive pressure drop across the nozzle.
GENERAL VALVE INSTALLATION
FIGURE 1. Valve Face O-Ring and Nozzle Control Valve
Valve Body Face
O-Ring
1. Place a supplied o-ring on the inside of the fly nut flush with the valve body face.
2. Thread the fly nut onto the nozzle body.
3. Orient the nozzle control valve so that the label is easily readable.
4. Hand tighten the swivel nut to secure the nozzle control valve to the nozzle body. Do not over tighten.
NOTE:
Frequently check the nozzle control valve nuts to ensure they are secure.
5. Repeat the previous steps to mount a nozzle control valve to each nozzle body on the spray boom.
Manual No. 016-0171-587 Rev. C
B OOM INSTALLATION
C H A P T E R 4
Nozzle
Body
17