FlipTop Touchpanel Control Center
12 • FlipTop Touchpanel Control Center: C2N-FT-TPS4/TPS4-U
Parts Supplied for the Optional Cable Management Plate
PART DESCRIPTION
Small Cable Bushing, 5/16 inch ID, 0.5 inch OD
Medium Cable Bushing, 0.39 inch ID, 0.64 inch OD
Large cable Bushing, 0.55 inch ID, 0.80 inch OD
Cable Support Plate
Screws, 4-40 x ¼ , black, Phillips head
The only tool required for installation of the cable support plate is a Phillips
screwdriver.
The cable support plate must be installed before mounting the TPS4 to a surface. The
cables are looped through the cable support plate.
1. Place the bushings on the cables (eight bushings supplied). Use the large
bushing for the VGA cable.
2. Thread the cables through the appropriate slot on the plate.
3. Snap the bushings into the plate slots.
4. Feed all the excess cable through the opening.
5. Attach the plate using the four 4-40 x ¼ screws supplied.
Cable Management Plate Installation
Mounting to Surface
The TPS4 is designed to mount in a horizontal surface, such as a desk top, lectern, or
podium. The following diagram illustrates the required opening size to accommodate
the TPS4. A cutout template (4007478) is included.
Crestron C2N-FT-TPS4/TPS4-U
Bushings
Cable Support Plate
(4) #4 x 1/4 LG Black Screws
Operations & Installation Guide - DOC. 6398
QUANTITY
4
2
2
1
4