Installation - Crestron C2N-FT-TPS4 Operations & Installation Manual

Fliptop touchpanel control center
Hide thumbs Also See for C2N-FT-TPS4:
Table of Contents

Advertisement

Crestron C2N-FT-TPS4/TPS4-U
Operations & Installation Guide – DOC. 6398
6. An alert message appears to notify you that the change was successful.
7. Repeat this procedure for each network device requiring a Net ID change.

Installation

Physical installation of the TPS4 includes installing an engraved touchpanel bezel,
installation of the supplied cable management plate, and mounting the unit to the
desired surface.
Installing Engraved Bezel
Use the Crestron Engraver software package to obtain a custom-engraved bezel for
the TPS4. Install the replacement bezel as follows.
A 1/16" Allen (hexhead) wrench is required for this procedure.
1. Remove and retain the four #4 buttonhead screws securing the bezel to the
flip-top cover. (Refer to the following illustration.)
2. Carefully lift the bezel from the unit.
3. Place the engraved bezel in position on the unit and attach it using the four
screws removed in step one.
Engraved Bezel Installation
#4 Buttonhead
Screws
Cable Management Plate
The TPS4 is shipped with a cable management plate and associated parts to provide
a pullout cable solution for up to eight AV, communication, control, or data cables
(cables not included). The parts include an eight-hole plate and grommets (bushings).
Refer to the following table.
FlipTop Touchpanel Control center: C2N-FT-TPS4/TPS4-U • 11
FlipTop Touchpanel Control Center