Section 1 – Installation

Unpacking the System

Carefully unpack the Model 4207D and all of its accessories. Visually inspect for any
damage that may have occurred during shipping. After the instrument is removed from the
shipping crate, the equipment and spare parts should be checked against the packing list to
insure that all parts have been received and none are damaged.
Remove the front cover of the instrument to remove the circuit board and spare parts that are
individually wrapped to prevent damage during shipment. Slide the circuit board into the
backplane as illustrated below; then replace the front cover.
Note: File an insurance claim with your freight carrier if damage has occurred
during shipping. Verify all parts shown on the enclosed packing list have been
received. If items are missing, please notify Chandler Engineering
immediately.

Utilities Required

Electrical:

Tools/Equipment Required

No special tools are required for the installation of the Model 4207D. Standard hand tools
are sufficient.

Connecting Power

Connect the power cord to an approved grounded receptacle in accordance with local wiring
codes. Model 4207D-60Hz is intended for use on, 200-240 VAC 60 Hz and Model 4207D-
50Hz is intended for use on, 200-240 VAC 50 Hz.
200-240 VAC, 50 Hz or 60 Hz, depending on model.
SECTION 1 – INSTALLATION
1-1