In case the installation site is a level surface, mount the inverter to the horizon-
tal-mounting bracket to meet the mounting angle requirements, as shown in
the figure below.
Take the following items into account when designing the bracket scheme:
Consider onsite climate conditions and take anti-snow and anti-rain meas-
ures if necessary.
Ensure that the waterproof connectors are at least 300mm higher than the
ground surface.
Bind the cables at the positions 300~350mm away from the DC connector,
AC waterproof terminal, and communication waterproof terminal.
The various waterproof terminals should be tightened in accordance with
the torque requirements in this manual to ensure that they are tight and
sealed.
Contact SUNGORW if you have any question.

4.2.4 Clearance Requirements

Reserve enough clearance around the inverter to ensure sufficient space for heat
dissipation.
4 Mechanical Mounting