Sungrow SG30CX Quick Manual

Sungrow SG30CX Quick Manual

Inverters commissioning with logger1000 and eyem4
Hide thumbs Also See for SG30CX:

Advertisement

Quick Links

SG30/50/110CX Inverters Commissioning Quick
Guide (with Logger1000 and EyeM4)
Disclaimer
The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76 168
258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a statement
or advice on any of the Electrical or Solar Industry standards or guidelines. Please observe all OH&S
regulations when working on Sungrow equipment.
Version
Revision History
1.0
First version
1.1
Issued for Approval
This document only applies to Sungrow Power three-phase inverters (including
SG30CX, SG50CX and SG110CX) with Logger1000 or EyeM4. The information in this
document may contain predictive statements including, without limitation, statements
regarding the future financial and operating results, future product portfolio, new
technology, etc. There are several factors that could cause actual results and
developments to differ materially from those expressed or implied in the predictive
statements. Therefore, such information is provided for reference purpose only and
constitutes neither an offer nor an acceptance. Sungrow Power may change the
information at any time without notice.
TD_20210219_SG30-50-110CX Commissioning Guide_V1.1
As we continuously improving our products, changes to this document may occur without notice.
© SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved.
Created by
AU Service Team
AU Service Team
Date
th
24
Dec 2020
th
19
Feb 2021
Page 1 of 21

Advertisement

Table of Contents
loading

Summary of Contents for Sungrow SG30CX

  • Page 1 Guide (with Logger1000 and EyeM4) Disclaimer The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76 168 258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a statement or advice on any of the Electrical or Solar Industry standards or guidelines.
  • Page 2: Table Of Contents

    Setup Export Control if required ..............19 Create Plant on iSolarCloud ................20 Updating the Logger1000/EyeM4...............21 TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 2 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 3: Introduction

    1 Introduction This quick guide is showing how to commission the SG30/50/110CX inverters and it is to be read in conjunction with the Sungrow’s User Manuals. Where more than one inverter, or an energy meter installed, the commissioning and iSolarCloud connection is done via a Logger1000(Up to 30 devices) and EyeM4(Up to 10 devices).
  • Page 4 Create a solar plant via iSolarCloud APP via an installer Monitoring account TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 4 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 5: Rs485 Connections

    RS485 in the inverter line (only the first and the last inverter) when more than 15 inverters are connected. TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 5 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 6: Energy Meter Connection

    • Terminal 21 = RS485+ A (Green) • Terminal 22 = RS485- B (White/Green) TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 6 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 7 DTSU666 energy meter. To upgrade the Logger1000/ EyeM4, refer to th Part 5 this document. TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 7 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 8: Connection To Logger1000

    COM2 on the portal. TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 8 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 9: Connection Via Eyem4

    Click "More" > "Settings" > “Operation Parameters” > “Other Parameters” > Enable” transparent transmission via standby RS485 port. TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 9 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 10 TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 10 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 11: Web Portal Setup

    If it is a Logger1000, it will TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 11 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 12: Set Local Time

    Navigate to ‘System Time’ under System and select Clock Source to ‘NTP’ and Time Zone to ‘UTC+10:00’ and make sure to Save TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 12 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 13: Scan For Inverters

    Scan for Inverters Navigate to ‘Device’ and click ‘Device List’ section and click ‘Auto search’. Sungrow inverters will be automatically detected as long as they are correctly connected and energized. Confirm the communication status for each device under Communication status section.
  • Page 14: Add Energy Meter

    Logger1000, the port number on the portal is COM3. TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 14 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 15 TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 15 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 16: Enable Remote Control

    Server Domain. Please make sure the domain address is api.isolarcloud.com.hk TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 16 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 17: Internet Connection

    (at the bottom) will be on. TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 17 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 18: Connect Via 4G (Eyem4A Only)

    (at the bottom) will be on. TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 18 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 19: Add Ct Transformation Ratio

    Example: A 50 kW inverter and need export limit to 20 kW, then enter ‘Fixed Value of Active Power’ to 20 kW. TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 19 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 20: Create Plant On Isolarcloud

    Then you only need to enter the customer’s basic information, and the plant will be created in a few minutes. TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 20 of 21 © SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved. As we continuously improving our products, changes to this document may occur without notice.
  • Page 21: Updating The Logger1000/Eyem4

    5 Updating the Logger1000/EyeM4 To upgrade the Logger1000/EyeM4, a laptop or a computer is required. You may contact Sungrow for assist if laptop/computer is not available on site. First get the Logger1000/EyeM4 connected to iSolarCloud (refer to Part 3.5 and 3.6...