Huawei FusionServer G5500 User Manual page 67

Hide thumbs Also See for FusionServer G5500:
Table of Contents

Advertisement

FusionServer G5500 Server
User Guide
Step 3 Install the G560.
Install filler modules in empty slots to avoid system alarms or performance deterioration.
1.
2.
Step 4 Check the indicator status after the G560 is powered on.
For details, see
----End
Issue 02 (2017-12-15)
Figure 4-11 Incorrect operations
NOTE
Insert the G560 horizontally into the chassis. See (1) in
Figure 4-12 Installing the G560
Close the ejector levers on the G560. See (2) in
2.3 Front Panel Indicators and
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
4-12.
Figure
4-12.
Buttons.
4 Setup
59

Advertisement

Table of Contents
loading

Table of Contents