FusionServer G5500 Server
User Guide
Context
To make full use of the space and prevent the GP608 from being removed forcibly, the upper
layer GP608 and the lower layer G560 adopt dislocation design. Therefore, you must install
the GP608 at the upper layer and then install the G560 at the lower layer.
Procedure
Step 1 Install the GP608. For details, see
Step 2 Unpack the packing case.
1.
2.
3.
4.
Issue 02 (2017-12-15)
Check whether the packing case and seals are in good conditions.
NOTE
If there is any damage (for example, the package is soaked or deformed, or the seals or pressure-
sensitive adhesive tapes are not intact), submit a Cargo Problem Feedback Form.
Use a box cutter to cut the pressure-sensitive adhesive tape on the packing case.
CAUTION
Be careful with the box cutter to avoid personal injury or equipment damage.
Unpack the G560.
Take out the G560s from ESD bags and place them separately on the ESD floor, as
shown in
Figure
4-10.
Figure 4-10 Correct operation
NOTE
Do not take out a G560 from its ESD bag if you do not install it immediately.