Safety Measures At The Place Of Installation - Leibinger JET2NEO Manual

Hide thumbs Also See for JET2NEO:
Table of Contents

Advertisement

Group 2
 Ventilation in the hydraulic cabinet
 Plastic containers are arranged in the
field of metal surfaces (PE-potential)

2.9 Safety measures at the place of installation

Mains connection!
The device has no mains switch and must only be connected to a easy
accessible plug socket in the direct vicinity of the place of setting up!
Installation of the device
The device must be installed in a well ventilated room only and must be kept
away from any source of heat, flame or sparks, e.g. radiant heater, etc.
Caution – Danger of explosion!
 The device should be only operated outside of explosive areas!
 The installation has to be carried out according to the installation
instructions of the manufacturer!
 The device has to be integrated in the lightning protection concept of the
operator!
 Precautions regarding electrostatics have to be carried out!
A place of setting up must be selected with sufficient load bearing capacity
and stability. When setting up it must be observed that sufficient movement
space is available for the operating and service personnel. Solvents are
processed in the device, sufficient room ventilation must be ensured!
Prior to assembly the place of setting up must be cleaned of dirt and
contamination (residue of lubricants etc.). The working place surroundings
should be kept clean at all times in order to ensure unrestricted access to the
LEIBINGER JET2neo device.
JET2 neo
Safety
 HV-cutoff at creepage current
 HV- and ink cutoff as well as nozzle sealing
at HV-flashovers
Page 21
Release R1.12 en

Advertisement

Table of Contents
loading

Table of Contents