 Ventilation in the hydraulic cabinet
 Plastic containers are arranged in the
field of metal surfaces (PE-potential)

2.9 Safety measures at the place of installation

Mains connection!
The device has no mains switch and must only be connected to a
easy accessible plug socket in the direct vicinity of the place of
setting up!
Attention – Danger of explosion!
The device should be only operated outside of explosive areas! The
installation has to be carried out according to the installation
instructions of the manufacturer!
Attention – Danger of explosion!
The device has to be integrated in the lightning protection concept
of the operator!
Attention – Danger of explosion!
Precautions regarding electrostatics have to be carried out!
Installation of the device
The device must be installed in a well ventilated room only and must
be kept away from any source of heat, flame or sparks, e.g. radiant
heater, etc.
A place of setting up must be selected with sufficient load bearing
capacity and stability. When setting up it must be observed that sufficient
movement space is available for the operating and service personnel.
Solvents are processed in the device, sufficient room ventilation must be
ensured!
2.10 Prior to assembly the place of setting up must be cleaned
14
 HV-cutoff at creepage current
 HV- and ink cutoff as well as nozzle sealing
of dirt and contamination (residue of lubricants etc.). The
working place surroundings should be kept clean at all
times in order to ensure unrestricted access to the