End Wall Prep - KidKraft TREASURE COVE Installation And Operating Instructions Manual

Play system
Table of Contents

Advertisement

Step 2: End Wall Prep
Part 1
It is important to assemble the frame on a flat, smooth surface.
A: Place (2771) End Post and (2770) End Post Left side by side with the grooves facing up and in. (2770) End
Post Left on the right hand side. Place (2769) Panel BT Frames in the top and bottom grooves and (2768) Panel
Floor in the middle grooves. (fig. 2.1)
B: Make sure assembly is square then attach with 4 (S30) #8 x 1-1/16" Wood Screws per board. (fig. 2.1)
C: Tap in 2 (TN1) 1/4" T-nuts in (2768) Panel Floor and each (2769) Panel BT Frame. (fig. 2.1 and 2.2)
Fig. 2.1
TN1
x 2
Top
Flush
2771
Fig. 2.2
TN1
Wood Parts
1 x
Panel Floor 1-1/4 x 3 x 42"
2768
2 x
Panel BT Frame 1-1/4 x 3 x 42"
2769
1 x
End Post 1-1/4 x 2-1/2 x 87"
2771
1 x
End Post Left 1-1/4 x 2-1/2 x 87"
2770
S30
x 4
2769
2768
TN1
Flush
TN1
Hardware
12 x
#8 x 1-1/16" Wood Screw
S30
6 x
1/4" T-nut
TN1
16
S30
x 4
2770
2769
Flush
TN1
S30
x 4
TN1
Bottom

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F23860

Table of Contents