SERVICE & INSTALLATION MANUAL for Cafection's Encore Ground
www.cafection.com
ANNEX 3
WEEKLY MAINTENANCE SCHEDULE
WEEKLY MAINTENANCE SCHEDULE
All important parts of the unit must be maintained as per the Maintenance Schedule to honor the warranty and to
avoid possible defects. Adequate maintenance will extend the life of the coffee machine and deliver a consistent
high quality beverage.
WEEKLY MAINTENANCE
Verify the filter paper level.
Sanitize the brew chamber with a hot water cycle.
Sanitize the solubles mixing bowl with a hot water cycle.
Capture data from the software.
Verify the overflow cup.
Verify the overflow tray.
PREVENTIVE MAINTENANCE SCHEDULE AT DIFFERENT CYCLES
ENCORE GROUND Rev. 0 2017-04
800-561-6162
5,000 cycles
Clean the brew group with a commercial urn cleaner.
10,000 cycles
Check & replace the outlet valves.
Check & replace the water filter.
25,000 cycles
Replace the brew group via Cafection's Brew Group Exchange Program.
Replace the whipping motor(s).
50,000 cycles
Delime the water tank & outlet valves.
100,000 cycles
Replace the water tank float, the heater switch & the water level switch.
ENCORE Series
ENCORE GROUND
MVF 04-2017
79
Need help?
Do you have a question about the Encore Ground and is the answer not in the manual?
Questions and answers