Etesia ET MOWER ETM105 Original User Manual page 27

Table of Contents

Advertisement

5•4•1•4 DEPTH OF THE PATH
The peripheral wire must be buried between 2 and 5 cm deep.
Warning, the current legislation prohibits the placement of any
other cable (an electric power cable, for example) in the path of the
peripheral wire. In addition, in order not to disturb the signal, the
cable must not, preferably, run alongside an electric installation or a
sanitation facility.
IT IS ESSENTIAL TO USE THE CABLE ETESIA ETC
OR ETC1.
ETESIA does not guarantee the operation of the machine
with another. Any problem that occurs because of
incorrect set-up cancels the warranty.
5•5 SETTING UP THE CHARGING
STATION
5•5•1 PLACEMENT OF THE CHARGING
STATION
When setting up the station, it is important to find a suitable place.
The station must, in short, be set up not far from a power source
(230 V~), and on an even, horizontal terrain.
At least 5 metres of peripheral wire must be able to be placed in a
straight line on either side of the charging station.
The connection to the network must be made via a differential
circuit breaker for an outside power supply (in accordance with the
current guidelines in the country of installation).
The charging station must be positioned behind the peripheral wire
(65 cm from the edge of the station cover). Thus, when your robot
mower ETM105 goes to recharge, the connection is made in the
optimal way.
5•5•2 RECOMMENDATION FOR THE
CHARGING STATION
PROGRESS
MEANINGS
1.
Near 230 V~ sector
2.
Plug connected to a suitable differential
circuit breaker (outside)
3.
Flat area, without obstacles in a 15 m
radius
4.
5 metres in a straight line on both sides of
the station
5.
The station must be behind the peripheral
wire (65 cm)
5•5•3 INSTALLATION REMOVABLE
LOADING STATION (ETBA)
- Place the base of the loading station upside down and mark on the
ground the location of the peripheral wire.
It's important to respect a distance of 67 cm for an ETM105 against
the base (pictures 20 and 21).
5• SETTING
- Install the peripheral wire (picture 22) (see chapter 5•1 to 5•4).
- Place the loading station base on the ground and mark its location
(pictures 23 and 24).
- Dig 25 cm deep and add 5 cm gravel (pictures 25 and 26).
- Place the base of the loading station in the hole and fill the sides
with gravel. Be sure that the base is straight compared with the
ground. Place the loading station in the base and be sure that you
can always insert the loading station after filling from the side
(picture 27).
- Twist the peripheral wire and bury it in direction to the base in order
to protect it. After that the wire must arrive in the rear left corner of
the base (pictures 28 and 29).
- Use the junction box to connect the peripheral wire to the station.
After that place the box under the base to protect it (pictures 30 and
31).
- Fill the edges with gravel and sand and/or earth to have a flat area
around the station (picture 32).
- In our case, a synthetic coating is placed on the top of the cover
to close the hole of the base (to use when the station is absent)
(pictures 33 and 34).
- Connect the station under power, test the return to station and adjust
the loading arm (pictures 35 and 36).
27

Advertisement

Table of Contents
loading

Table of Contents