1.6 Safety Operation

1.6.1 Operator safety
Personal Fall Protection
Personal fall protection equipment (PFPE) is required when operating this machine. If PFPE is required
in job site or in operator's manual, the following rule should be complied with:
All PFPE must comply with applicable governmental regulations, and must be inspected and used in
accordance with the PFPE manufacturer's instructions.

1.6.2 Workplace safety

This machine is not electrically insulated and will not provide protection from contact with or
proximity to electrical current.
a)
Obey all local and governmental regulations regarding required clearance from electrical power
lines. At a minimum, the required clearance contained in the table below must be followed. Allow
for platform movement, electrical line sway or sag, and beware of strong or gusty winds;
No.
1
2
3
4
5
6
Table 1-1 Required clearance
Line Voltage
0 to 50KV
50 to 200KV
200 to 350KV
350 to 500KV
500 to 750KV
750 to 1000KV
Required Clearance
3.05 m
10ft
4.60 m
15ft 1in
6.10 m
20ft
7.62 m
25ft
10.67m
35ft
13.72m
45ft