Download Print this page

Swan Analytical Instruments AMI Codes-II CC Operator's Manual page 21

Advertisement

AMI Codes-II CC
Installation
3.
3.1.
On-site
requirements
Installation
Electrical Wiring Do not switch on the Instrument until all electrical connections are
If ordered:
pH Option
Reagents
Power-up
Instrument
Setup
Run-in period
pH sensor
calibration
A-96.250.581 / 181120
Installation
Installation Check List
AC variant: 100–240 VAC ( 10%), 50/60 Hz ( 5%)
DC variant: 10–36 VDC
Power consumption: 35 VA maximum.
Protective earth connection required.
Sample line with sufficient sample flow and pressure (see
Instrument Specification, p.
Mount the instrument in vertical position.
Display should be at eye-level.
Mount the filter, filter vessel, and constant head cover. Connect the
sample and waste line. See
made.
Connect all external devices like limit switches, current loops and
pumps.
Connect power cord.
See
Electrical Connections, p. 29
See
Install the pH Option, p. 25
Prepare reagents. See
Insert the suction lances.
Lock pump tubes.
Turn on the sample flow and wait until the flow cell is completely
filled.
Switch on power.
Start <Fill system>. See
Program all parameters for external devices (interface, recorders,
etc.). Program all parameters for instrument operation (limits,
alarms, measuring interval).
Let the instrument run continuously for 1 h.
If ordered: Calibrate pH sensor. See
18).
Connecting Sample and Waste, p. 23
Refill or replace Reagents, p.
Fill or Flush Reagent System, p. 41
Calibration, p. 54
49.
21

Advertisement

loading
Need help?

Need help?

Do you have a question about the AMI Codes-II CC and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel