Replacing Parts - Angelo Po 191PI2E Use And Installation Manual

Electric jacketed boiling pan
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 25
ADJUSTING THE LID COUNTER-BALANCING
To carry out this operation, proceed as follows.
1 - Fit the spanner (A) onto the hexagon (B).
2 - Keep a firm grip on the spanner (A) and undo
the locking screws (C).
3 - Turn the spanner (A) clockwise to load the
spring or anti-clockwise to release it.
4 - Once the correct balance is obtained, screw in
the screws (C) without tightening them fully.
5 - Use the spanner (A) to turn the shaft until it is
located in one of the seats provided.
6 - Fully tighten the screws (C).
REPLACE PROCEDURE
The appliance does not require the replacement of
operating components by specialist staff except the
replacement of standard parts which can be carried
out by the user.
DECOMMISSIONING THE APPLIANCE
Important
This operation must be carried out by
skilled operatives in compliance with the le-
gal requirements with regard to safety at
work. Never dump non-biodegradable ma-
terials, lubricating oils and non-metallic

REPLACING PARTS

- 19 -
C
C
A
A
B
B
components (rubber, PVC, resins, etc.) in
the environment. Dispose of them in ac-
cordance with the relevant legal require-
ments.
IDM-39616301600.tif
IDM-39615401800.tif
9
IT
GB
DE
FR
ES
English

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

191pi2ea

Table of Contents