Feed in new belt from top with links in direction shown.
10
Use (1) zip-tie to help line up belt sections.
11
Slide master link through both ends until they meet.
12
Install Front door.
14
Plug in unit.
15
527-504revF_EN
Remove/Replace Conveyor Belt (Cont..)
39
Vertical Toaster
DCFT-MCD Series
Printed in USA 1/15 © 2015