Prince Castle DCFT-MCD Series Service Manual page 16

Vertical toaster
Hide thumbs Also See for DCFT-MCD Series:
Table of Contents

Advertisement

Vertical Toaster
DCFT-MCD Series
Remove/Replace Heel Compression Adjust Assy (cont.)
On both left and right side of conveyor belt, secure
13
vice grip to bracket and top nut to hold assembly in
position.
Bracket
Nut
Slide assembly drive shaft out of bearing.
14
Pry assembly on left and right sides to release
15
assembly out of frame.
Release both vice grips, press downward on top edge
16
of assembly and pull assembly out of frame. Set
assembly aside.
Printed in USA 1/15 © 2015
16
527-504revF_EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dcft-mcdauDcft-mcdceDcft-mcdnaDcft-mcdnz

Table of Contents