INSTALLATION AND STARTUP (CONTINUED)
1) Each unit should be installed on a substantial foundation around the entire
bottom of the unit's base ring or mounted on casters. After following installa-
tion procedures and unit has been started - if there appears to be secondary
vibrations transmitted to the foundation or to the separator base, the struc-
ture must be reinforced. (With further questions contact Sponge-Jet, Inc.)
Figure 1
Door Location
2) Make certain unit is level and in a position for easy access to motor and
lubrication points. Refer to maintenance section for proper greasing and
greasing locations.
3) End User must address the hazard of reaching the eccentric weight mech-
anism when the separator is mounted on an elevation as to which it can be
reached from the underside. Provide a plate or screen to prevent this from
happening.
4 Holes 9/16" (14.288 mm) diameter
equally spaced on a 26" (660.4 mm)
diameter bolt circle.
SPONGE-JET 70P 70E USER MANUAL |
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 70P Recycler and is the answer not in the manual?

Related Products for Sponge-Jet 70P Recycler

This manual is also suitable for:

70e recycler

Table of Contents