Sponge-Jet 70P Recycler User Manual page 12

Table of Contents

Advertisement

SCREEN INSTALLATION
Screen installation is one of the most important aspects of any screening
equipment. Incorrect screen installation causes not only poor separation but
can destroy a screen.
BASIC SCREEN CHANGING STEPS
1. Before starting any screen changing steps be sure to Lockout/Tagout the
machine.
2. Loosen and remove the outer "V" clamp ring using a 3/8-inch drive ratchet
with a 6-point deep well socket.
3. Take this time to wipe off any excess material or debris left on the screen
before removing. Then remove the screen and set it off to the side.
4. To secure the screen properly take the time to thoroughly clean both the
spacing frame flanges.
5. Replace the spacing frame. Make sure the screen and frame are centered
on the frame below.
6. Install the "V" clamp ring making sure the nut of the clamp ring bolt is on
your right-hand side. If your clamp ring has a quick release over the center
latch secure before tightening.
7. The Clamp ring should be tapped moderately with a rubber mallet during
tensioning to insure it will seat properly.
8. Tighten the two clamp ring bolts equally to ensure even tensioning. (Pass
the tools around the separator so nothing accidentally falls onto the new
screen.)
| SPONGE-JET 70P 70E USER MANUAL
12

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 70P Recycler and is the answer not in the manual?

Related Products for Sponge-Jet 70P Recycler

This manual is also suitable for:

70e recycler

Table of Contents