Download Print this page

Landoll Brillion WFPD23 Operator's Manual page 20

Wing float pulverizer

Advertisement

Tire and Wheel Installation
WARNING
Use a torque wrench to assure proper torque.
Insufficient torque can cause stud breakage
and damage the wheel pilots. Over torque can
stress the Wheel Bolts.
NOTE
All tire/wheel assemblies are mounted with the valve stem
facing outward from Hub and Spindle.
The Pulverizer uses 11L-15 12PLY rating tires and should
be inflated to 52 PSI.
Install Tire and Wheel Assemblies onto Hub and Spindles
with 1/2-20 x 1 Wheel Bolts. See Figure 2-4. Tighten
1/2-20 x 1 Wheel Bolts to 50 ft-lbs using the sequence in
Figure 2-3. Tighten to a full torque of 85-90 ft-lbs.
Leave supports under the frame to support the machine in
case of weight shift while adding components.
2-6
TABLE OF CONTENTS
Hub and Spindle
Assembly
Figure 2-4: Tire and Wheel Assembly
a
Figure 2-3: Stud Tightening Sequence
NOTE
Torque will drop after the first 10 hours of operation.
Check the nuts for proper torque after this interval and
re-tighten them.
Transport Axle
Assembly
Wheel and Tire
Assembly
Valve Stem Outward
Wheel Bolt,
1/2-20 x 1
F-1108-0121

Advertisement

loading