Kostal PIKO 36 EPC Operating Manual page 53

Hide thumbs Also See for PIKO 36 EPC:
Table of Contents

Advertisement

Installation
1
2
3
3
Language
Fig. 39: Display on the inverter
"UP" arrow key
1
"DOWN" arrow key
2
"ENTER" key
3
Select language and confirm.
9.
The "Date/time" menu appears on the display.
P
Set date and time and confirm.
10.
The "Overvoltage protection" menu appears on the
P
display.
Activate overvoltage protection for DC and/or AC, if
11.
this has been installed.
The "Country setting" menu appears on the display.
P
Select and confirm the desired country/standard/
12.
directive.
A confirmation field for the "Country setting" appears
P
on the display.
In order to save the country setting, select and
13.
confirm the confirmation field "Yes".
The settings are assumed by the inverter.
H
The inverter is in operation and can now be used. Initial
commissioning is completed.
© 2017 KOSTAL Solar Electric GmbH
4
5
6
7
8
9
10
11
INFO
The entry of date/time ensures that
the downloaded log data has the
correct time assigned to it.
INFO
The inverter is supplied without
overvoltage protection modules.
However, these can be subsequently
retrofitted for the AC and DC sides
in the inverter. Once the overvoltage
protection is activated, it is monitored
by the inverter. For more information
Ch. 8.6
INFO
Once the country setting has been
confirmed, it can only be changed by
an installer or by entering the service
code.
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents