Maintenance And Service - Kostal PIKO 36 EPC Operating Manual

Hide thumbs Also See for PIKO 36 EPC:
Table of Contents

Advertisement

Maintenance
1
2
3

8.1 Maintenance and service

Once correctly installed, the inverter runs virtually
maintenance-free.
The following maintenance tasks are to be carried out for
the inverter:
Activity
Carry out fan test
and check whether the
1)
fans function properly.
Clean fans as required
Ch. 8.2
Check cable connections and plugs
Clean fans
Ch. 8.2
Tab. 9: Maintenance list
If no maintenance work is carried out, this results in an
exclusion of the warranty (see 'Exclusion of warranty' in
our Service and warranty conditions).
© 2017 KOSTAL Solar Electric GmbH
4
5
6
7
Interval
1x annually or
after an incident
1x annually
1x annually
8
8
9
10
11
) The fan test can only be performed in
1
feed-in mode (green LED lit).
DAMAGE POSSIBLE
Dirty or blocked fans mean that the
inverter is not adequately cooled.
Insufficient cooling of the inverter
may result in output reduction or
the failure of the system.
Always mount inverters in such a
way that falling parts cannot fall
into the inverter through the ven-
tilation grill or mount the optional
fan cover.
111

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents