Kostal PIKO 36 EPC Operating Manual page 101

Hide thumbs Also See for PIKO 36 EPC:
Table of Contents

Advertisement

System monitoring
1
2
3
Prerequisites for data transfer to a solar portal:
Inverter has an Internet connection
H
Logged onto a solar portal (e.g. PIKO Solar Portal)
H
Portal code of solar portal (e.g. P3421)
H
Activation of data transfer in the inverter
H
Activating data transfer to a solar portal via the
control panel
Select the "Settings" menu on the control panel of
1.
the inverter.
Confirm with the "ENTER" key.
2.
Use the "UP", "DOWN" and "ENTER" keys to select
3.
the "Communication"/"Portal configuration" menu.
Enter the portal code of the solar portal in the
4.
"Code:" field. The portal code can also be assigned
via the Webserver under "Portal configuration".
The portal code for the PIKO Solar Portal
(www.piko-solar-portal.de) is P3421.
Portal configuration
Data export
Code:
Fig. 52: Entry of the portal code
© 2017 KOSTAL Solar Electric GmbH
4
5
6
6
7
8
9
10
11
INFO
A correctly set-up network connec-
tion/Internet connection is a prerequi-
site for data transfer
It may take as much as 20 minutes
following activation (dependent upon
the portal) until the data export is
visible on the solar portal.
The transfer time may increase if the
connection is impaired (e.g. poor
wireless connection).
101

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents