Storage; Installation And Electrical Connection; Personnel Qualifications; Operator Responsibilities - Wilo -SiFire FIRST Installation And Operating Instructions Manual

Table of Contents

Advertisement

en
5.3

Storage

6
Installation and electrical con-
nection
6.1

Personnel qualifications

6.2

Operator responsibilities

6.3
Information on monitoring
devices
14

Installation and electrical connection

ƒ
Attach lifting gear to base frame:
Transport with forklift: Rectangular recesses in the base frame.
Transport with lifting gear:
- Fixation eyes on base frame: Sling chain with sling hook with safety latch
- Eye bolt screwed into base frame: Sling chains or transport straps with shackle
ƒ
Permissible angle specification for the lifting gear:
Fixation with sling hook: ±24°
Fixation with shackle: ±8°
If the angle specifications cannot be complied with, use spreader beam!
ƒ
System with diesel motor: Keep the unit horizontal during transport to prevent the
operating fluids in the motor (motor oil, diesel fuel and battery acid) from leaking.
WARNING
Diesel motor: Environmental damage due to leaking operating fluids!
Systems with diesel motors use the following operating fluids: Motor oil, diesel fuel
and battery acid. These operating fluids are harmful to the environment and must
not be released into the soil or waters. Ensure that no operating fluid leaks during
storage. Wipe up drips immediately, e.g. place an oil mat underneath.
Risk numbers:
• Diesel fuel: R 40, R 65, R 66, R 51/53
• Battery acid: R 35
ƒ
Place the system on a firm and even surface.
ƒ
Ambient conditions: 10 °C ... 40 °C, max. humidity: 50 %.
ƒ
Dry hydraulics and pipework before packing.
ƒ
Protect the system from humidity and dirt.
ƒ
Protect the system from direct exposure to sunlight.
ƒ
Electrical work: qualified electrician
Person with appropriate technical training, knowledge and experience who can
identify and prevent electrical hazards.
ƒ
Installation/dismantling work: qualified fire protection specialist according to the
state of the art (EN 12845)
Correct installation and connection of the system to the supply line
ƒ
Lifting work: trained specialist for the operation of lifting devices
Lifting equipment, lifting gear, attachment points
ƒ
Observe locally applicable accident prevention and safety regulations.
ƒ
The installation company is responsible for ensuring that the entire completed fire
protection system complies with the appropriate standards. The installation com-
pany provides the operator with the "Installation in accordance with EN 12845" cer-
tification as well as the required documents.
ƒ
Observe local regulations for operating fire protection systems.
ƒ
Check that the available consulting documents (installation plans, installation loca-
tion, inflow conditions) are complete and accurate.
ƒ
Provide protective equipment. Ensure that the protective equipment is worn by per-
sonnel.
ƒ
Demarcate the working area.
ƒ
Keep unauthorised persons away from the working area.
ƒ
The foundation must be of sufficient stability in order to allow the system to be
fixed in a secure and functional manner. The operator is responsible for the provision
and suitability of the foundation!
ƒ
Observe all regulations for working with heavy loads and under suspended loads.
ƒ
For the main pump, only a fuse protection against short-circuiting is provided. The
fuse protection in accordance with EN 12845 is installed in the switchgear.
ƒ
Do not provide thermal overload protection for the main pump!
WILO SE 2020-12

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Wilo-SiFire FIRST and is the answer not in the manual?

Table of Contents