Viavi SmartClass OLP-85 Series Operating Manual page 64

Fiber optical power meters
Table of Contents

Advertisement

9 D
M
ATA
ANAGEMENT
D
P
ATA MANAGEMENT OF
ROBE AND
64
PCM
TESTS
To view the previous test result:
The selected test result is displayed in full screen.
I
[A]
Press the
key and tap the
J
Sorting test results
The measurement data overview is displayed.
I
[A]
1.
Press the
key.
2.
Tap the
[More]
button, then tap the [Sort
3.
Select the desired sorting order.
Show/hiding the overview columns
The measurement data overview is displayed.
I
[A]
1.
Press the
key.
2.
Tap the
[More]
button, then tap the [Shown
3.
Tap any column header to toggle its hide/show status.
Deleting stored results from a project
The measurement data overview is displayed.
I
1.
Select one, multiple or all tests.
[A]
2.
Press the
key.
3.
Tap the [Delete
Selected]
The selected test results are deleted.
Actions when viewing images
[Prev]
button.
Order]
Columns]
button.
OLP-85/OLP-85P
button.
button.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartclass olp-85p seriesSmartclass olp-85Smartclass olp-85p

Table of Contents