Viavi SmartClass OLP-85 Series Operating Manual page 18

Fiber optical power meters
Table of Contents

Advertisement

3 G
S
ETTING
TARTED
U
NPACKING THE INSTRUMENT
NOTE:
18
Replacing batteries
Fig. 4
Replacing the batteries
1
RBP2 Li-Ion Battery Pack
2
Latch lock
3
AA battery tray
The battery compartment is on the back of the instrument.
1.
Press down the latch to release and to open the lid of the
battery compartment.
2.
Insert new batteries in the tray or remove the used batteries
from the tray and replace all eight with fresh ones.
Take care to insert the batteries correctly. The correct polarity is
indicated by a diagram inside the battery compartment.
– or –
Insert new or replace the RBP2 Li-Ion Battery Pack.
– or –
Switch from non-rechargeable batteries to rechargeable ones
by replacing the battery tray with a new battery pack (or vice
versa).
3.
Close the battery compartment.
[E]
4.
Press the
key to switch on.
Recharging the batteries
The rechargeable RBP2 Li-Ion Battery Pack is recharged when
the PS4 Universal AC/DC Power Supply is being used to power
the instrument. The instrument switches to trickle charging
automatically as soon as the RBP2 Li-Ion Battery Pack is fully
charged.
OLP-85/OLP-85P

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartclass olp-85p seriesSmartclass olp-85Smartclass olp-85p

Table of Contents