Powering On - Fujitsu TeamPoS 2000 Installation And Maintenance Manual

Table of Contents

Advertisement

TeamPoS 2000

7.1.1 Powering ON

Make sure all peripherals are securely connected to the control unit.
1.
Make sure the power cord is plugged into the power source.
2.
Lift the plastic switch cover at the front of the control unit.
3.
Press the ON switch.
4.
Confirm the power/battery status LED is lit solid, indicating the successful completion
of power-up diagnostics.
Note: Some peripherals, such as scanners and scales, may be separately powered.
Check the peripheral manuals for instructions on powering on these peripherals.
Any hardware errors detected on power up will appear on the operator display
(LCD or CRT). Note that the model VF 50 two-line alphanumberic display does
not display error messages.
Note: Depending on setup, a momentary depression of the switch may signal the
application to shut the unit down, which could take a few minutes. If power is
not immediately turned off, either wait for the application to shut the unit down,
or keep the switch depressed for approximately 4 seconds. For proper shutdown
procedures, see the application software documentation.
7-2
Rev 3.0
MAINTENANCE MANUAL
90000291

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tp2000

Table of Contents