Running The Group 1 Tests - 3Com EtherLink III User Manual

Parallel tasking 16-bit isa adapter
Hide thumbs Also See for EtherLink III:
Table of Contents

Advertisement

Running th e G ro u p 1 Tests
The Group 1 tests include:
■ Register Access Test
■ EEPROM Vital Data Test
■ EEPROM Configurable Data Test
■ FIFO Loopback Test
■ Interrupt Test
■ Ethernet Core Loopback Test
■ Encoder/Decoder Loopback Test
fcw
For a description o f each Group 1 test, access Help by pressing
[Fi], When the Help screen appears, tab to the <lndex>
command button and press [Enter], Use the arrow keys to
move through the Index listings. Select Test Definitions and
press [Enter],
To run the Group 1 tests, follow these steps:
1 Under the Test pull-down menu, select Run Tests. Press
[Enter].
The Run Tests dialog box appears, with the <Start> command
button highlighted.
2
Press [Enter] to start the tests.
Group 1 tests run ten times (default setting) unless you
specify otherwise. The test results are displayed on the
screen in the Results column.
To run the tests continuously, go to the Repetitions box on
the Test Setup screen and select Continuous (and deselect
Halt on Error in the Errors box). To access the Test Setup
screen, select Test in the menu bar and then select Test Setup
in the drop-down menu. Press [Enter],
Starting the Diagnostic Program

Advertisement

Table of Contents
loading

This manual is also suitable for:

3c509b-tpo3c509b coax3c509b-tp3c509b-combo

Table of Contents