Running The Group 1 Tests - 3Com EtherLink 3C590 User Manual

Parallel tasking pci bus master network adapters
Table of Contents

Advertisement

Running the Group 1 Tests

The Group 1 tests include:
Register Access Test
EEPROM Test
FIFO Loopback Test
Ethernet Core Loopback Test
Encoder/Decoder Loopback Test
Interrupt Test
For a description of each Group 1 test, access Help by pressing
[F1]. When the Help screen appears, tab to the <Index>
command button and press [Enter]. Use the arrow keys to
move through the Index listings. Select Test Definitions and
press [Enter].
To run the Group 1 tests, follow these steps:
1 Under the Test pull-down menu, select Run Tests. Press
[Enter].
The Run Tests dialog box appears, with the <Start>
command button highlighted.
2 Press [Enter] to start the tests.
Group 1 tests run ten times (default setting) unless you
specify otherwise. The test results are displayed on the screen
in the Results column.
To run the tests continuously, go to the Repetitions box on
the Test Setup screen, and select Continuous (and deselect
Halt on Error in the Errors box). To access the Test Setup
screen, select Test in the menu bar, and then select Test
Setup in the drop-down menu. Press [Enter].
Starting the Diagnostic Program
4-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Etherlink iii

Table of Contents