Running the Group 1 Tests

The Group 1 tests include:
Register Access Test
EEPROM Test
FIFO Loopback Test
Ethernet Core Loopback Test
Encoder/Decoder Loopback Test
Interrupt Test
For a description of each Group 1 test, access help by pressing
[F1]. When the help screen appears, tab to the Index button
and press [Enter]. Use the arrow keys to move through the
Index listings. Select Test Definitions and press [Enter].
To run the Group 1 tests, follow these steps:
1 Under the Test pull-down menu, select Run Tests.
Press [Enter].
The Run Tests dialog box appears, with the Start button
highlighted.
2 Press [Enter] to start the tests.
Group 1 tests run ten times (default setting) unless you
specify otherwise. The test results are displayed on the screen
in the Results column.
To run the tests continuously, go to the Repetitions box on
the Test Setup screen, and select Continuous (and deselect
Halt on Error in the Errors box). To access the Test Setup
screen, select Test in the menu bar, and then select Test Setup
in the drop-down menu. Press [Enter].