Agilent Technologies OmniBER OTN Series Installation Manual page 27

Communications performance analyzer
Hide thumbs Also See for OmniBER OTN Series:
Table of Contents

Advertisement

Installation.book Page 24 Monday, January 12, 2004 1:13 PM
1
Introduction
24
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
• Before handling the assembly, select a work area where
potential static sources are minimized. Avoid working in
carpeted areas and non-conductive chairs. Keep body
movement to a minimum. It is recommended that you use a
controlled static workstation.
• Avoid touching any components or edge connectors. When
you install the assembly, keep one hand in contact with the
protective bag as you pick up the assembly with your other
hand. Before installing the assembly, ensure that you are
grounded or make contact with the metal surface of the
mainframe with your free hand to bring you, the assembly,
and the mainframe to the same static potential. This also
applies whenever you connect or disconnect cables on the
instrument.
Installation Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

J7230bJ7232aJ7230b-004J7230b-005

Table of Contents