Mitsubishi Q Series User Manual page 161

Loop control module
Hide thumbs Also See for Q Series:
Table of Contents

Advertisement

6 PROGRAMMING
6 - 4
*2: Before executing program control, the PID constants of zone1 and zone2 need to be set by
the program control auto tuning (X11).
When program control is executed by the set pattern, it operates as follows.
Segment number
Segment 1
Segment 2
Segment 3
Segment 4
Process Value (PV)
150
50
Zone PID=2
Segment 1
200s
*3: After setting parameter by the cascade control setting command (X15), execute cascade
control by turning on the cascade control switching command (X8).
In this program example, the parameter setting for cascade control and the other parameter
settings (normal control, program control, and manual control2) cannot be set at the same
time.
After setting the parameter for cascade control, do not use the normal control mode switching
command (X4), program control mode switching command (X5), and manual control mode 2
switching command (X7).
Setting value
Set value
Executing time
1500 (150 )
200 (200s)
1500 (150 )
100 (100s)
500 (50 )
100 (100s)
500 (50 )
100 (200s)
Zone PID=2
Zone PID=1
Segment 2
Segment 3
100s
100s
MELSEC-Q
Zone PID data No.
2 (Zone 2)
2 (Zone 2)
1 (Zone 1)
1 (Zone 1)
Zone PID=1
Segment 4
100s
6 - 4
time

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q62hlcSw0d5c-qtcu-eSw0d5c-qtcu-ea

Table of Contents