9. Disassemble PTO intermediate shaft:
A. Use a bearing puller to remove bearing (Item 1) if
necessary.
10.Disassemble PTO output shaft:
A. Use a bearing puller to remove bearing (Item 1).
B. Remove gear (Item 2) and retaining ring (Item 3).
C. Remove retaining ring (Item 4) and thrust washer
Item 5).
D. Use a bearing puller to remove bearing (Item 6) if
necessary.
11. Disassemble shift arm:
A. Remove two (2) lock pins from shift arm.
B. Remove two (2) O–rings (Item 1).
Workman 3000/4000 Series
6
3
2
1
Page 6 – 57
1
Figure 123
Figure 124
5
4
7
Figure 125
Figure 126
Drive Train
1