Set delay groups for each time slot.
Set the delay group (I to V) for each 30-minute slot. Touch
z
[Invl] if delay control is not to be used.
7
Touch [Register].
The settings are registered and the operation dialogue
z
closes.
To cancel the settings, touch [Cancel].
z
8
Touch [Delay group settings].
The "Delay group settings" dialogue is displayed.
z
9
Put a check mark in the "Select" column.
Select the demand delay group you want to edit.
z
6
Demand delay
Ctrl delay time
(min)
Release delay
(min)
10
Touch [Set].
7
The operation dialogue is displayed.
z
8
189
Setting delay times [Delay time settings]
9
Ie to Ve These correspond to groups 1
to 5 and are referenced when
there is a change in the power
demand level.
Ig to Vg These correspond to groups 1
to 5 and are referenced when
there is a change in the gas
demand level.
Shows the time (0 to 60 minutes)
to delay when the demand level
increases.
Shows the time (0 to 60 minutes)
to delay when the demand level
decreases.