Users can access the inverter parameters via the following interfaces
Figure 4-2
4.2

Preparing commissioning

Prerequisites: before you start
Before starting the commissioning, you should clarify the following.
Are the factory settings sufficient for your application?
Check which factory settings can be used and which functions need to be changed (see
section Commissioning with factory settings (Page 60)). During this check you will probably
find that the factory settings only require slight adjustment.
Which motor are you using? [P0300]
A synchronous or induction motor?
The inverters are preset in the factory for applications using 4-pole three-phase induction
motors that correspond to the performance data of the inverter.
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 07/2010, FW 4.3.2, A5E02299792B AA
Inverter's parameterization interfaces
4.2 Preparing commissioning
E:4 S C-V3N97875
s
SINAMICS
MICRO MEMORY CARD
6 S L 3 2 5 4 - 0 A M 0 0 - 0 A A 0
Commissioning
57

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120 cu240e-2Sinamics g120 cu240b-2 dpSinamics g120 cu240e-2 dpSinamics g120 cu240e-2 fSinamics g120 cu240e-2 dp-f

Table of Contents