Connecting
3.4 Installing Control Unit
3.4
Installing Control Unit
3.4.1
Snapping the Control Unit onto the Power Module
IP20 Power Modules
Figure 3-10
To gain access to the terminal strips, open the top and bottom front doors to the right. The
terminal strips use spring-loaded terminals.
50
Insert the Control Unit on the Power Module and then remove
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 07/2010, FW 4.3.2, A5E02299792B AA