Installing Control Unit; Snapping The Control Unit Onto The Power Module - Siemens SINAMICS G120 CU240B-2 Operating Instructions Manual

With the control units
Hide thumbs Also See for SINAMICS G120 CU240B-2:
Table of Contents

Advertisement

Connecting

3.4 Installing Control Unit

3.4
Installing Control Unit
3.4.1

Snapping the Control Unit onto the Power Module

IP20 Power Modules
Figure 3-10
To gain access to the terminal strips, open the top and bottom front doors to the right. The
terminal strips use spring-loaded terminals.
50
Insert the Control Unit on the Power Module and then remove
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 07/2010, FW 4.3.2, A5E02299792B AA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120 cu240e-2Sinamics g120 cu240b-2 dpSinamics g120 cu240e-2 dpSinamics g120 cu240e-2 fSinamics g120 cu240e-2 dp-f

Table of Contents