Siemens SINAMICS G120 CU240B-2 Operating Instructions Manual page 229

With the control units
Hide thumbs Also See for SINAMICS G120 CU240B-2:
Table of Contents

Advertisement

In addition to the individual checksums of the parameters, the inverter calculates and saves
the following values:
1. The "total" checksum across all checksums.
2. Time of the last parameter changed.
Labeling the drive
Processor 1
...
p9798
p9799
...
p9798
p9799
Data backup
Parameter
PLC program
Circuit diagrams
Countersignatures
Commissioning engineer
This confirms that the tests and checks have been carried out properly.
Date
Machine manufacturer
This confirms that the parameters recorded above are correct.
Date
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 07/2010, FW 4.3.2, A5E02299792B AA
Processor 2
p9898
p9899
p9898
p9899
Storage medium
Type
Designation
Name
Name
7.10 Safe Torque Off (STO) safety function
Checksums
r9781[0]
r9781[0]
Date
Company/dept.
Company/dept.
Functions
Total
Time stamp
r9782[0]
r9782[0]
Holding area
Signature
Signature
229

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120 cu240e-2Sinamics g120 cu240b-2 dpSinamics g120 cu240e-2 dpSinamics g120 cu240e-2 fSinamics g120 cu240e-2 dp-f

Table of Contents