OPERATION
Transporting on a Trailer
1. Remove the short (nine inches long) Transport Lock
from under the Wing Support and place it over the
exposed Transport Axle Cylinder Rod.
2. Insert Clevis Pin and Hair Pin Cotter.
3. Close the Fold Shut-off Valve completely, by backing
off Jam Nut and turn Valve CW until it bottoms.
Tighten Jam Nut.
3-4
4. Raise the Transport Axle to where the Center Roller
5. Disconnect Drawbar from tractor.
6. Retract Telescoping Drawbar.
7. Disconnect (Quick Coupling) Hydraulic Hoses and
8. Remove Turnbuckle and the Drawbar Pins.
Figure 3-3: Trailer Transport Set-Up
Axle and the Transport Axle Tires are both touching
the Trailer Deck. See Figure 3-4.
the Ag Harness from where the frame connects to
the Drawbar.
F-661R4