Network Management Card (Optional); Installing A Serial Network Management Card (Optional); Monitoring Software - ABB PowerValue 11 RT G2 User Manual

Hide thumbs Also See for PowerValue 11 RT G2:
Table of Contents

Advertisement

6 C O M M U N I C AT I O N

6 .4 Network management card (optional)

The PowerValue 11 RT G2 1–3 kVA is equipped with
an intelligent slot for optional cards for remote
management of the UPS through the Internet/
intranet. Either of the following accessories can
be installed in the intelligent slot:
• SNMP/Modbus Card – SNMP/Modbus, HTTP
and monitoring capabilities through a Web
browser interface.
• AS400 Card – AS400 card for AS400
communication protocol.
6 .4 .1
card (optional)
Each UPS has a communication slot for an
optional serial network management protocol
(SNMP/Modbus) card. After installing an SNMP/
Modbus card, an environmental monitoring probe
can be connected.
NOTE
Installing a serial network management
THE UPS DOES NOT HAVE TO BE SHUT
DOWN BEFORE INSTALLING A
COMMUNICATION CARD.
To install a network management card:
1. Remove the two screws that protect
the UPS communication slot.
2. Insert the SNMP/Modbus card into
the communication slot.
3. Screw the SNMP/Modbus card onto the slot
using the screws removed in Step 1
4. Screw the SNMP card onto UPS rear panel for
GND connection.
When connect SNMP to the computer,
the recommended max length of shielded
RJ45 cable is 2m to fulfill the FCC part15
Class A requirement.
For more information on the SNMP/Modbus
Cards, see the SNMP/Modbus user's manual.
6 .4 .2

Monitoring software

The UPS can be monitored using software.
The software provides a remote and safe
shutdown for multi-client systems in case of
the absence of power at the UPS output.
Instructions on how to install the software are
provided with the network management cards.
For more information, contact your local supplier.
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents