Download Print this page

Yardistry YM11909 Installation And Operating Instructions Manual page 6

Pavilion

Advertisement

Note: It is critically important you start with square, solid and level footings, concrete
pad or deck to attach your Pavilion.
We supply Post Mounts with this structure which gives you the flexibility to permanently install your structure
to a pre-existing or new wood or concrete surface.
The hardware to attach the Post Mount to the structure is included.
The hardware to mount the structure permanently will need to be purchased separately at your local
hardware store.
If you are mounting to concrete footers see below for the correct locations and placement. Please double
check for possibility of any underground utilities such as gas, telephone, cable or sprinkler lines.
Following are some examples of how to mount the structure to wood or concrete surfaces.
Refer to your local building and city codes, ordinances, neighbourhood covenants, or height restrictions
regarding this type of structure for guidance on acceptable installation requirements.
Concrete Footer
Permanent Installation Examples
post to post
plinth to plinth
Post Mount
9' 6-1/2"
(2.91m)
Post to Post
Post to Post
10'-6"
1
9'-4
" 2
Anchoring Hardware not included
To
Required
Depth
8' 8"
(2.64 m)
Post to Post
11' 7-1/8"
(3.53 m)
Plinth to Plinth
7' 7-1/2"
(2.32 m)
Plinth to Plinth
6
8' 6"
(2.59 m)
support@yardistrystructures.com

Advertisement

loading