Download Print this page

Yardistry YM11700 Installation And Operating Instructions Manual

12 x 14 pergola room

Advertisement

Quick Links

12 x 14 Pergola room
Installation and Operating Instructions – YM11700
Yardistry – North America
Toll Free Customer Support: 1.888.509.4382
info@yardistrystructures.com
www.yardistrystructures.com
Yardistry / Selwood Products – Europe
Customer Support: +44 1284 852569
parts@selwoodproducts.com
www.selwoodproducts.com
12 x 14 Arched Pergola Room
YM11645
Revised 04/20/2016
12ft
3.7 M
4.73M
14 ft
HEIGHT:
8' 8or 2.63m

Advertisement

loading

Summary of Contents for Yardistry YM11700

  • Page 1 12 x 14 Pergola room Installation and Operating Instructions – YM11700 12 x 14 Arched Pergola Room YM11645 Revised 04/20/2016 12ft 3.7 M Yardistry – North America Toll Free Customer Support: 1.888.509.4382 info@yardistrystructures.com 14 ft www.yardistrystructures.com 4.73M Yardistry / Selwood Products – Europe Customer Support: +44 1284 852569 parts@selwoodproducts.com...
  • Page 2: Important Safety Notice

    Wood is NOT flame retardant and will burn. Grills, fire pits and chimineas are a fire hazard if placed too close to a Yardistry structure. Consult user’s manual of the grill, fire pit or chimnea for safe distances from combustible materials.
  • Page 3: Limited Warranty

    Limited Warranty Yardistry warrants that this product is free from defect in materials and workmanship for a period of one year from the original date of purchase. In addition, all lumber is warranted for 5 years against rot and decay. This warranty applies to the original owner and registrant and is non-transferable.
  • Page 4: Instructions For Proper Maintenance

    Instructions for Proper Maintenance Your Yardistry structure is designed and constructed of quality materials. As with all outdoor products it will weather and wear. To maximize the enjoyment, safety and life of your structure it is important that you, the owner, properly maintain it.
  • Page 5 Permanent Installation Examples Note: It is critically important you start with square, solid and level footings, concrete pad or deck to attach your Pergola Room. We supply Room L-Mounts with this structure which gives you the flexibility to permanently install your structure to a pre-existing or new wood or concrete surface.
  • Page 6 Permanent Installation Examples cont. Concrete Patio (min. 10’ 2” x 10’ 2”) with 12” clearance on all sides #10 x 1-1/4” Pan Screws Included Anchoring Hardware not included Wood Deck (min. 10’ 2” x 10’ 2”) with 12” clearance on all sides #10 x 1-1/4”...
  • Page 7 support@yardistrystructures.com support@yardistrystructures.com...
  • Page 8: Part Identification

    Part Identification ( Dimensions are approximate and are shown to assist in the identification of parts for assembly. Actual dimensions may be smaller or larger. 38.1 x 38.1 x 409.6mm 32pc. (185) - Horizontal Insert 2 x 2 x 16-1/8" - Box 1 Y50119-185 38.1 x 38.1 x 574.7mm 64pc.
  • Page 9 Part Identification ( Dimensions are approximate and are shown to assist in the identification of parts for assembly. Actual dimensions may be smaller or larger. 38.1 x 139.7 x 527.1mm 38.1 x 139.7 x 870mm 4pc. (067) - Beam 20-3/4" 2 x 6 x 20-3/4" - Box 3 4pc.
  • Page 10: Hardware Identification

    Hardware Identification ( Dimensions are approximate and are shown to assist in the identification of parts for assembly. Actual dimensions may be smaller or larger. 1/4 x 2" 9pc. H2 - Hex Bolt - (Y07427-920) 5/16 x 3" 4pc. - Hex Bolt - (Y07427-330) 5/16 x 4-1/2"...
  • Page 11 Hardware Identification ( Dimensions are approximate and are shown to assist in the identification of parts for assembly. Actual dimensions may be smaller or larger. 9 pc. - 2 x 3 Trellis Clip (Y00419-003) 1 pc. - Beam Hanger (4 Pk) (Y70819-011) support@yardistrystructures.com...
  • Page 12 • Please retain this information for future reference. You will need this information if you contact the Consumer Relations Department. PRODUCT NUMBER: YM11700 CARTON I.D. STAMP: __ __ __ __ __ ___ (Box 1) CARTON I.D. STAMP: __ __ __ __ __ ___ (Box 2) CARTON I.D.
  • Page 13 Step 2: Assemble “X” Inserts A: Place one X Insert Pin into one X Insert, then attach a second X Insert to form a complete Insert. Make sure the pieces are tight to each other. B: Repeat Step A to make 32 complete Inserts. Fig.
  • Page 14 Step 3: Assemble 8 Panels Part 1 (241) Engineered Panel Post Fig. 3.1 Long Note: You will be assembling 8 Panel Post Assemblies in total in Step 3. A: Lay one (241) Engineered Panel Post Long and one (239) Engineered Panel Corner Post Long on edge so the grooved sides face each other, on a level surface.
  • Page 15 Step 3: Assemble 8 Panels Part 2 Fig. 3.2 Fig. 3.3 (241) Engineered Panel Corner D: Slide one complete Insert in from Post Long the top of the panels and down to the (189) Cross (185) Horizontal Insert. (fig. 3.2) Brace Insert #8 x 3”...
  • Page 16 Step 4: Attach Panel Posts to Corner Posts Part 1 (241) Engineered Fig. 4.1 Panel Post (239) Long Engineered Panel Corner Post Long Note: Only pre-drill one post per assembly A: On (239) Engineered Panel Cor- ner Post Long, per assembly, pre-drill two holes from the inside, at the places shown in fig.
  • Page 17 Step 4: Attach Panel Posts to Corner Posts Part 2 Fig. 4.3 #8 x 2-1/2” #8 x 2-1/2” Wood Wood Screws Screws B: Through the pre-drilled holes attach two Panel (235) Corner Posts assemblies to one (235) Corner Post Long Post Long with one #10 x 4”...
  • Page 18 Step 5: Attach L - Mount Brackets A: Pre-drill with a 1/8” drill bit and attach two L Mounts (one L Mount Right and one L Mount Left) flush to the inside edge, at the bottom of each Panel Post with two #10 x 1-1/4” Pan Screw per L Mount as shown in fig. 5.1, 5.2 and 5.3.
  • Page 19 Step 6: Attach Plinths to Corner Post Assembly Part 1 A: Place one (034) Short Plinth B Assembly with one (035) Short Plinth A Assembly tight to each other and attach using two #6 x 30 mm Trim Screw at the opposite corners per Plinth. (Fig. 6.1 and 6.2) Note: Plinths will be attached to four corners.
  • Page 20 Step 6: Attach Plinths to Corner Post Assembly Part 2 B: On the outside of the corner post assembly, place two (033) Long Plinth Assembly tight against each other using 2 #6 x 30 mm Trim Screws per Plinth. Be sure they are flush and tight. (Fig. 6.3 and 6.4) Fig.
  • Page 21 Step 6: Attach Plinths to Corner Post Assembly Part 3 C: Place one (032) End Plinth Assembly onto each Corner Post Assembly. Line them up with previously placed Plinths. Make sure they are flush and tight to each other and then fasten with two #6 x 30 mm Trim Screw per end.
  • Page 22 Step 6: Attach Plinths to Corner Post Assembly Part 4 Note: Make sure all plinths are lined up, flush and level before installing remaining screws. D: After the End Plinth have been placed, go back and install the two remaining #6 x 30 mm Trim Screws per end to the assembled Plinth of the Pergola Room.
  • Page 23 STEP 4A Step 7: Locate Corner Post Assemblies Fig. 7.1 A: Move your Corner Post Assemblies to the final location. Make sure the ground is flat and level before continuing assembly. B: Stand all four complete Corner Post Assemblies so they form a rectangle as shown in fig.
  • Page 24 Step 8: Assemble Beam Ends Fig. 8.1 10-1/2” Two Beam Ends attached on opposite side of cut-out #10 x 4” Wood Screws A: On a flat and level surface attach one (192) Beam (069) Beam End 10-1/2” to (192) Beam End 34-1/4”...
  • Page 25 Step 9: Attach Beams to Corner Post Assemblies It is important the proper hardware gets 5/16 x 5 5/16 Lock Beam End Fig. 9.1 Hex Bolt Washer placed in the places shown. You install the Assembly Hex Bolts first and then the screws. Panel Post 5/16 Flat Long...
  • Page 26 Step 10: Attach Arch Beam Fronts It is important the proper hardware gets Corner of placed in the places shown. Make sure Corner Post Fig. 10.1 Assembly you install the Hex Bolts first and then the 5/16” t-nut wood screws. Attach one (195) Arch Beam Front in between two Corner Post Assemblies as shown in fig.
  • Page 27 Step 11: Attach Arch Beam Offsets It is important the proper hardware gets Arch Beam Fig. 11.1 Front placed in the places shown. #10 x 4” Wood #8 x 2-1/2” A: Attach one (080) Arch Beam Offset Screw x 3 Wood #8 x 2-1/2”...
  • Page 28 Step 12: Attach Arch Beam Centres Part 1 A: Attach one (079) Arch Beam Centre to Fig. 12.1 #10 x 1 1/4” each (234) Beam 105-1/2” using one Beam Pan Screw x 11 per Hanger Hanger and eleven #10 x 1 1/4” Pan Screw per Beam Hanger (fig.
  • Page 29 Step 12: Attach Arch Beam Centres Part 2 C: Centre (079) Arch Beam Centres Fig. 12.3 over the pilot holes in (234) Beam 105- 1/2” and attach using six #10 x 4” Wood (079) Arch Beam Centre Screws per side (fig. 12.3 & 12.4) D: Repeat Step C for second (079) Arch Beam Centre.
  • Page 30 Step 13: Attach Support Beams Part 1 A: Leaving the T-nut installed, remove the 5/16 x 6” Hex Bolt (5/16” lock washer and 5/16” flat washer) from Step 10a Fig. 13.1 each Beam End Assembly installed in Step 9. (fig. 13.1 &...
  • Page 31 Step 13: Attach Support Beams Part 2 It is important the proper hardware gets placed in the places shown. Fig. 13.3 B: Attach one (231) Support Beam to each Beam End Assembly and (235) Engineered Panel Corner Post Long by replacing the 5/16 x 6” Hex Bolt (lock washer and flat washer) removed in Part 1.
  • Page 32 Step 13: Attach Support Beams Part 3 Fig. 13.6 D: Attach (231) Support Beams to (234) Beam 105 1/2” using sixteen #8 x 2 1/2” Step 10C Wood Screws per side as shown in fig.13.6 & 13.7. Fig. 13.7 Fig. 13.7 #8 x 3" WS  x12 (234) Beam 105 1/2”...
  • Page 33 Step 14: Assemble Trellis Ends A: On a flat and level surface, fit together one (233) Trellis End Short and one (232) Trellis End Long. (fig. 14.1) B: Place one Trellis Clip over the joined ends and attach with one 1/4 x 2” Hex Bolt (with two 1/4” flat washer and 1/4”...
  • Page 34 Step 15: Attach Trellis End Assemblies Part 1 A: Measure 59-1/4” from the inside of each (234) Beam 105-1/2” and place one Trellis End Assembly on the (080) Arch Beam Offsets, (079) Arch Beam Centres and (195) Arch Beam Fronts. This should be centred and both ends should hang 9-3/4”...
  • Page 35 Step 15: Attach Trellis End Assemblies Part 2 D: Starting at the centre Trellis End Assembly and working outwards attach four Trellis End Assemblies on either side alternating each Trellis End Assembly so the Trellis Clip is on opposing sides to the assemblies next to it. (fig.
  • Page 36 Step 16: Attach Left and Right Arch Gussets Part 1 Note: The bevelled ends on each Arch Gusset should always face away from the wood it is attaching to. A: At two corners of the assembly attach one (194) Arch Gusset Left to the (241) Engineered Panel Post Long with one #8 x 3”...
  • Page 37 Step 16: Attach Left and Right Arch Gussets Part 2 Note: The bevelled ends on each Arch Gusset should always face away from the wood it is attaching to. C: Attach one (237) Arch Gusset Right Long or one (236) Arch Gusset Left Long to the remaining (241) Engineered Panel Post Longs using two #8 x 3”...
  • Page 38 NOTES support@yardistrystructures.com...
  • Page 39 NOTES support@yardistrystructures.com...
  • Page 40 Would you recommend the purchase of our products to friends and family? Comments: MAIL TO: Yardistry c/o Solowave Design 375 Sligo Road W. Mount Forest, Ontario, Canada Yardistry would like to say Thank You for your time and feedback. N0G 2L0 Attention: Customer Service REVISION: 10/18/11 support@yardistrystructures.com...