Download Print this page

Yardistry YM11909 Installation And Operating Instructions Manual page 37

Pavilion

Advertisement

Step 13: Truss Assemblies
Part 2
B: With a helper place (841) Ties with brackets tight against (831) Rafters. Make sure (841) Ties are level then
attach Tie Wrap Brackets to (831) Rafters with two #10 x 1-1/4" Pan Screws on both sides of each bracket.
(F13.2, F13.3, F13.4 and F13.5)
C: Pre-drill with a 1/8" drill bit and secure Tie Wrap Brackets to (841) Tie and (831) Rafter with one #10 x 2-1/2"
Pan Screw per bracket. (F13.3, F13.4 and F13.5)
Y50000-841- Tie
S12-Wood Screw #10 x 1-1/4
S23-Wood Screw #10 x 2-1/2
S34-Wood Screw #12 x 1-1/4
F13.2
#10 x 1-1/4"
Pan Screw
F13.3
Front Side
#10 x 2-1/2" Pan Screw
(pre-drill before installing)
Tie Wrap
Bracket
Y50000-841- Tie
S12-Wood Screw #10 x 1-1/4
S23-Wood Screw #10 x 2-1/2
S34-Wood Screw #12 x 1-1/4
Y50000-841- Tie
S12-Wood Screw #10 x 1-1/4
S23-Wood Screw #10 x 2-1/2
S34-Wood Screw #12 x 1-1/4
(841) Tie
F13.5
#10 x 1-1/4"
Pan Screw
(831)
Rafter
Tie Wrap
Bracket
#10 x 2-1/2" Pan Screw
(pre-drill before installing)
37
#10 x 2-1/2" Pan Screw
(pre-drill before installing)
#10 x 1-1/4"
F13.4
Pan Screw
Back Side
Hardware
32 x #10 x 1-1/4" Pan Screw
8 x #10 x 2-1/2" Pan Screw
support@yardistrystructures.com
x 2
#10 x 1-1/4"
Pan Screw

Advertisement

loading