Festo CPVSC1-VI Manual page 75

Cpv-sc valve terminal
Hide thumbs Also See for CPVSC1-VI:
Table of Contents

Advertisement

5. Maintenance and conversion
Festo P.BE−CPVSC−EN en 0301a
Please note
When fitting the double−solenoid valve (Ident. code J), note
the correct position of the control and work valves:
The control valve is situated to the left of the work valve.
They thereby guarantee the correct functioning of the
double−solenoid valve.
If there is a gap between the valve terminal and the mount
ing surface, the electric linking may be pressed out of posi
tion when the components are fitted.
Make sure that the electric linking is held in position,
·
e.g. by pushing against it with your hand.
You then guarantee the electric contact between the com
ponents and the electric linking.
2. Place the component on the tie rod.
3. Press against the component so that it snaps into position
in the electric linking.
Fig. 5/3: Fitting a component in a valve location
5−9

Advertisement

Table of Contents
loading

Table of Contents