How To Set And Add A Pdu2000 - Huawei ECC800 User Manual

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual (for ECC800-Pro)
Step 2 Add a 5G DC power supply.
1.
2.
Table 8-7 Adding a 5G DC power supply
Path
Choose System
Settings >
Device
Management
and click Add
Device. The
parameters for
adding devices
are displayed.
3.
----End

8.1.6.8 How to Set and Add a PDU2000?

Prerequisites
One end of the straight-through cable has been connected to the COM 1 or COM 2 port on the
PDU2000, and the other end has been connected to the COM port on the ECC800-Pro
collector, UIM20A expansion module, or ETH converter.
Issue 06 (2020-04-22)
Log in to the ECC800-Pro WebUI as an administrator.
Add a 5G DC power supply.
Parameter
Device attribute
Device Type
Connect To
Communications
Port
Device Address
Click Test Connect to check whether the 5G DC power supply is properly connected to
the ECC800-Pro.
If the connection is normal, click Confirm. The connected devices are displayed in
the Number of connected devices list.
If the connection is abnormal, check whether the device is properly connected to the
ECC800-Pro, whether both are running properly, and whether the parameter
settings are consistent with the device parameters.
Copyright © Huawei Technologies Co., Ltd.
Setting
Select a DC Power Source from the drop-down list
box.
Select MTS9604B_MTS9606B Power Supply
from the drop-down list box.
Select ETH Converter from the drop-down list
box.
Select COM1/COM2 from the drop-down list box.
NOTE
The setting example indicates that the 5G DC power
supply is connected to the COM1 port on the
ECC800-Pro. If the 5G DC power supply is connected to
another port, enter the number of the connected port.
In this example, Device Address is set to 1. Set the
device address based on the actual situation.
8 FAQ
234

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecc800-pro

Table of Contents