Flowchart Of The Adjustment Sequence; The Main Board Was Replaced (Normal Procedure) - GRAPHTEC FCX4000 Service Manual

Hide thumbs Also See for FCX4000:
Table of Contents

Advertisement

8
ELECTRICAL ADJUSTMENTS
8.2

Flowchart of the Adjustment Sequence

Flowchart of the Adjustment Sequence for the FCX4000 series.
8.2.1

The main board was replaced (Normal procedure)

When the main board was exchanged, copy adjustment values to the main board from the SUB-NVRAM by
the following procedure.
8.6 Clearing the Non-Volatile RAM for corresponding model
8.4 Set the dip switch for corresponding model
8.5 Updating the System Firmware
8.8 Remove the SUB-NVRAM from previous main board
8.8 Install the SUB-NVRAM to the new main board
8.8 Copy the adjustment values from the SUB-NVRAM to main board
End of Main Board replacement
FCX4000-UM-251-9370
8-2

Advertisement

Table of Contents
loading

Table of Contents