Checking System Before Power-On - Mitsubishi Electric AnyWire NZ2AW1C2AL User Manual

Cc-link-anywireaslink bridge module
Table of Contents

Advertisement

4.5

Checking System Before Power-on

This section describes the items to be checked before power-on.
1.
Check that the bridge module is mounted or connected correctly. (Page 24 MOUNTING MODULE)
2.
Check that the total length of the CC-Link is within the specified range. ( User's manual for the master module used)
3.
Check that the total length of the AnyWireASLINK system is within the specified range. (Page 19 Performance
Specifications)
4.
Check that the power supplied to the bridge module is within the specified range. (Page 31 Supplying Power to a
Bridge Module)
5.
Check that the bridge module, slave module, terminating unit, and 24VDC external power supply are properly connected
and wired.
4 CONNECTIONS
4.5 Checking System Before Power-on
4
35

Advertisement

Table of Contents
loading

Table of Contents