4.5
Checking System Before Power-on
This section describes the items to be checked before power-on.
1.
Check that the bridge module is mounted or connected correctly. (Page 24 MOUNTING MODULE)
2.
Check that the total length of the CC-Link is within the specified range. ( User's manual for the master module used)
3.
Check that the total length of the AnyWireASLINK system is within the specified range. (Page 19 Performance
Specifications)
4.
Check that the power supplied to the bridge module is within the specified range. (Page 31 Supplying Power to a
Bridge Module)
5.
Check that the bridge module, slave module, terminating unit, and 24VDC external power supply are properly connected
and wired.
4 CONNECTIONS
4.5 Checking System Before Power-on
4
35