System Pressure Interconnections; Setting Up A Manual Mass Set; Figure 6. Pg9602 Interconnections - Fluke PG9000 Series Operation And Maintenance Manual

Piston gauges
Table of Contents

Advertisement

2.3.1.2

System Pressure Interconnections

Interconnect the PG9000 Platform, pressure generation / control components
and a test connection.
The pressure connection on the PG9000 TEST port is DH200 (DH200 is
equivalent to Autoclave Engineers SF250C, and High Pressure Equipment
Company (HIP) LF4). Adapters to convert the DH200 connection to 1/8 in. NPT
female and 1/4 inch Swagelok
accessories.
Use the supplied fittings in the Accessory Kit (p/n 3995944) to build the PG9602
interconnections. See Table 1. PG9602 Parts List.

Figure 6. PG9602 Interconnections

The pressure connections for an optional Automatic Mass Handler are described
in Section 2.3.1.5.
2.3.1.3

Setting up a Manual Mass Set

If installing a MS-AMH-100 mass set for use with an automated
mass handling system, see Section 2.3.1.5.
To install a PG9000 manual mass set, place the mass loading tray (provided with the
mass set accessories) at the desired location then install the individual masses on
the mass loading tray. For convenience the main masses are stacked in reverse
order to facilitate the proper mass loading protocol onto the PG9000.
See Section 2.3.1.5 for instructions on installation of an AMH mass set for
automated mass handling.
Installing Masses on the Mass Loading Tray (Manual Mass Set)
PG9000 masses are shipped in reusable, molded shipping and storage cases.
One of the cases contains the masses of size 5 kg and under, the other cases
contain the make up mass (4 or 9 kg depending on the mass set size), and main
masses of 5 or 10 kg each. Each mass is packed in a plastic bag and then placed
in a protective shipping insert.
The stability over time of PG9000 pressure measurements is a
function of the stability of the masses loaded on the piston.
Precautions should be taken in handling the masses to minimize
influences that may change their mass.
wearing protective gloves when handling the masses to avoid
contaminating them with body oils and perspiration. Protective
gloves are provided in the accessory kits of PG9000 Platforms.
Page 19
®
tube fitting are provided with PG9000 Platform
Note
 Caution
This includes always
2. INSTALLATION
© 2011 Fluke Calibration

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg9602

Table of Contents