5.6.2
Terminal
For routine maintenance, there is not a requirement to open the PG Terminal. The power supply
fuse is located in the power entry module and has a pull out fuse tray that is accessible from the
outside of the PG Terminal. To open the PG9000 Terminal proceed as follows:
Disconnect power.
Remove the pop-off screw covers on the bottom of the case.
Remove the four case screws.
Lift OFF the cover. Be careful not to over stress the ribbon cables connecting the display
and keypad in the cover to the printed circuit board in the base.
Disconnect the cover to base ribbon cables at the connectors on the base printed
circuit board. Be aware that the connectors are locking connectors.
To reassemble, proceed in reverse order.
5.6.3
AMH Removal
To remove the AMH-100-VAC from the PG9000 Platform, see Section 3.7.2.2.
5. MAINTENANCE, ADJUSTMENTS AND CALIBRATION
Page 177
© 2011 Fluke Calibration